Berry Plastics

Fire, smoke and water damage restoration to production lines and structural components of the Berry Plastics manufacturing plant in Oklahoma.
Learn more about how BELFOR provided support
		
		            
                
                    Download Case Study
						
                
                
                    Download Case Study
						
                
            
		
	Loss Event: Fire and Water Damage
Damage: Major damage to main production lines as well as interior
and exterior structural components.
BELFOR RECOVERY SOLUTIONS
STRUCTURE
- Erected scaffolding over the entire plant floor (40,000-square-feet) to clean
 and replace burnt metal decking, insulation and structural framing.
- HEPA-vacuumed and cleaned walls, ceilings, floors, walkways, light fixtures,
 piping, mixers and chillers.
- Removed odor and airborne contaminants to prevent cross contamination and
 keep production lines operational.
- Removed and replaced all damaged pipe insulation and structural wrap on the
 downed production lines.
ELECTRONICS & MACHINERY
- Emergency service repairs were made to the electrical system as well as to
 pumps and motors that serviced the production lines.
- Industrial ultrasonic cleaning and decontamination of all machinery and
 electronics in the impacted area.
- BELFOR brought in BAMCOR machinery rebuilding specialists to disassemble
 machinery in three of five production lines to allow for cleaning of various parts
 and motors. BAMCOR reassembled the machinery and performed start-up and
 debug procedures
.jpg)
 
                                             
                                            